Set day is when the living sections are placed onto the elevated foundation using a crane. It marks the transition from delivery to onsite assembly.
Living sections typically arrive about 75 to 80 percent complete, including major interior systems and finishes.
Inspecting before delivery ensures structural connections, finish protection, and systems are verified before the home is exposed to the jobsite.
No. This is a construction method. Living sections are part of a code compliant coastal home designed for flood zones and hurricane exposure.